Time schedule
▪ Time schedule (as seen today):
• 2015-12-01: Notifications may take place 相关告示公布
• 2016-01-01: First Notified Bodies are listed (2 weeks period for objection!)
• Immediate issue of prepared certificates by VDE 授权机构的公布
From now on, CE marking may take place
• 2016-12-01: End of transition period 过度期限
From now on, CE marking is mandatory, based on type tests of Notified Bodies
Tough time schedule for manufacturers (and Notified Bodies) during transition period
Solution: Order and perform fire tests now at accredited test institutes like VDE, which use your results after notification for issuing the necessary certificates. 解决方案:马上联系具有相应资质的检测机构(如VDE),对线缆的相关等级进行评估,测试数据将会被保留,并体现在将来被认可的测试报告当中。
Round Robin
▪ Experience from CEMAC, also following recent discussions, e.g. in Cenelec TC20WG10:
Comparability of fire tests, especially complex tests like EN 50399, between different labs is a big challenge Round robins should be performed
▪ Group of Notified Bodies decided to initiate round robins continuously 授权测试机构认同持续的测试数据比对是必要的
▪ Start 2015 with round robin covering EN 50399
• Around 30 participants 参与者
• Management: SP (S), Organization: EGOLF 管理方
• Steering Group: Efectis (F), ISSeP (BE), L.S. Fire (IT), VDE (D) 指导小组
• Time schedule: tests end of 2015, evaluation in 2016, report in 2017 时间表
• Samples: expected 3x power cables with well-known fire performance 举例
|
|